Structural Specialists for Warehouse Engineering

For engineers and project leads who need precise load calculations and steel detailing for logistics facilities across Malaysia.

What Contractors Say About Our Drawings

Feedback from structural engineers and project leads who review our blueprints before pouring concrete or ordering steel.

Answers for structural engineers and project leads who need clear direction before committing to a design review.

Frequently Asked Questions About Structural Blueprints

We begin with the client's load schedule and the proposed column grid. From there we check the load path from the roof and racking system down to the foundation. The output is a set of structural blueprints with member sizes, connection details, and a clear load summary for each zone of the warehouse.

What does a typical structural blueprint package include?

Yes. We regularly work with logistics operators who have an existing steel frame and need to verify whether it can support additional mezzanine floors or heavier automated racking. We produce a load-bearing assessment that states the safe capacity of the current structure and where reinforcement is required.

Can you assess an existing warehouse structure before we add new racking?

For most projects, the full cycle takes four to six weeks. This covers the initial load analysis, the first draft of the structural drawings, and two revision rounds. If the site has unusual soil conditions or the design requires a deep foundation solution, the timeline extends by one to two weeks.

How long does a structural review take for a large logistics warehouse?

We follow the Malaysian Standards and the relevant Eurocode provisions for steel and concrete structures. The load combinations, deflection limits, and connection design all reference these codes. We also account for local wind and seismic factors where they apply to the site location.

Which engineering standards do you apply in your calculations?

You need a site plan, the proposed racking layout, and the load data for each racking type. If the warehouse is already built, we also need the original structural drawings or a recent survey of the steel members. Soil investigation reports are helpful but not mandatory for the first consultation.

What information do you need from us before starting the analysis?

We provide a stamped structural report that your contractor can use for permit submission and for the actual construction work. The report includes the design assumptions, the load calculations, and the final blueprints. We also stay available for clarifications during the tender and construction phases.

What do we receive at the end of the engagement?

Send Your Structural Brief for Review

Share your warehouse layout, column grid, and racking loads. We return a preliminary load-bearing assessment within five working days, with clear notes on foundation demands and steel frame sizing.

Submit Your Project Details
Cookie settings

We use cookies to keep the site reliable, remember basic choices, and understand which pages are useful. You can accept, reject, or review the settings before continuing.